2023 Productivity Benchmark Report
1,000 Factories’ Productivity Data: The Largest Dataset of Its Kind
On average, manufacturers in this study achieved productivity increases that allowed them to make 5 days of product in just 4 days. Unlike typical benchmark reports, this study is not based on survey data or anecdotal evidence. The analysis is compiled of data read directly from equipment and work centers that have deployed the QAD Redzone connected workforce solution.
This anonymized analysis includes the 2023 records of:
- 1,000 food & beverage and CPG plants
- 327,059 frontline workers
- 11,145 production lines
- 9,429,710 production shifts
- 31,764,706 production runs
If your Download does not start Automatically, Click Download Whitepaper